CONTAINER AVENUE / Catalogue

Construction site storage containers

Models: 44Guide prices from £550 excl. VAT

A site tool store and an office have different requirements. Compare storage and office configurations below, then describe the equipment, people and daily access the space needs to serve. Include the project duration and any planned moves.

SITE STORAGE & OFFICES

Compare site storage and office models

Availability to be confirmed.

Your budgetGBP · excl. VAT

Container price per unit, excluding delivery.

44 products·United Kingdom
AI illustration — actual unit and equipment to be confirmed

1–24 of 44 products

Back to filters

1–24 of 44 products

Back to filters

Construction site tool storage

Start with the items that go out first in the morning. Put them where they can be collected without unloading bulky equipment. Choose which way the doors face so someone collecting tools can approach without crossing the unloading area. Ask which locking fittings come with the unit.

Construction site storage container placement

Send the site plan as it will look on delivery day, including temporary fencing, haul roads and the proposed unloading point. Mark the pedestrian route and confirm where the doors can open. Agree a slot and a site contact who can meet the driver.

Can I move a site storage container during the build?

Arrange the second location and a lift before the current position is hemmed in by scaffolding or materials. Tell the haulier what will be inside and confirm what must be taken out. Keep a route open for collection if the last phase changes the site entrance.

Questions about site containers

Does a site container come with reinforced locking?

Ask which locking equipment and any security rating apply to the actual unit. Have the locks, lockbox, accessories and installation included in the offer where required. The category name and condition grade do not establish those features.

Can I have a tool store and a site office on the same delivery?

Send one plan with the final position of each unit. Mark which must be placed first if either could block access to the other. Ask for the units, unloading and any office connection work to be listed separately.