Prepare the site for a shipping container

Prepare a site plan before arranging delivery. The groundworks contractor and carrier need to assess the approach, unloading area and final supports for the actual container and operation.

Draw access, unloading, and placement separately

Draw the container with doors, fitted equipment and daily loading routes. Separately mark the lorry approach, turning and exit route, and its unloading work area. These spaces serve different purposes.

Draw access, unloading, and placement separately. 1: Truck access. 2: Working area. 3: Position and doors.

Visual reference

  1. Truck access
  2. Working area
  3. Position and doors

Illustrative diagram, not to scale.

  • Label the truck route, unloading area and final container position on the plan.
  • Reference the photos with the same letters or numbers as on the drawing.
  • Note measurements at narrow passages and other restricted points, not just at the gate.
  • Mark permanent obstacles and those that can be moved before delivery.

Check the weight the ground can support

Record the soil or fill, existing slab, slope, recent work, cracks, settlement and areas that hold water. These observations help the assessment; they do not measure bearing capacity.

Have the loaded container, vehicle and unloading equipment assessed separately. They load different positions, and ground conditions can change after rain.

Have the supports designed for the ground and load

Have support positions, sizing and preparation defined for the ground, container, contents and modifications. An existing slab needs assessment too; adding blocks or shims at random is not a substitute for the project plan.

Checks to make for each solution
Situation or solution consideredWhat to checkWhat to watch for
Existing slabComposition, condition, capacity, and compatibility with the planned supportsA flat slab is not necessarily strong enough
Point supports defined for the projectLocation, sizing, stability, and level of each supportSupports that fit another container may not fit yours
Prepared and compacted platformNature of layers, ground treatment, and planned checksThe visible surface layer is not enough to know the whole support
Uncertain soil, fill, or slopeAssessment of the ground and necessary work before bookingDo not make up for uncertainty with improvised shimming on the day

Deal with water and utilities before earthworks

Show runoff, downpipes and low spots. Plan drainage with the rest of the site so water does not pool around supports or make the route unusable.

Before digging or drilling, have buried services located and identified. Give the groundworks team and carrier details of known utilities, manholes, pits and buried structures; records and visible covers alone do not establish that the area is clear.

Keep the spot usable after placement

Keep door movement, staff access and the route of long or bulky items clear after placement. Allow access for inspection and maintenance. For refrigeration or fitted equipment, use the actual instructions for ventilation, connections and service clearances.

Settle the last details before booking

Send a dated plan and marked photos. Agree who prepares the ground, builds and checks supports, unloads and positions the container, with the services priced in writing.

Finish outstanding work before booking and report changes before the lorry leaves, including heavy rain, new excavation, blocked access or a different position.

Check the placement, then keep an eye on the supports and doors

Stay outside the handling area and approach only when the operator says it is safe. Check orientation, supports, clearance and door operation against the plan; photograph the finished placement.

Watch for settlement, water or doors becoming harder to close. Have the installation checked if conditions change. Do not move supports yourself beneath a loaded container.

Site information to send

  • Measured plan separates the approach, work area and final position.
  • Ground, water, fill and uncertain areas recorded.
  • Buried services and structures identified for the work.
  • Supports and preparation defined for the actual load.
  • Door, loading and maintenance clearances retained.
  • Responsibilities, services and recent changes agreed before delivery.

Find the right type of container

Containers to compare

Models available from our partner sellers. Indicative prices exclude VAT, transport, and unloading. The images show the models: ask for recent photos of the container you are buying.

Technical references

Key points

  • Plan the truck route, unloading area and final position separately.
  • Have the ground and supports assessed for the loaded container.
  • Agree what must be ready before delivery.