Back to catalogue

CONTAINER AVENUE / Project guides

Refrigerated container prices

See the estimates

Compare the purchase price with the cost of getting cold storage working on site. Include machinery checks, delivery, electrical connection, commissioning, energy and maintenance.

Compare 20 and 40 feet, new and used

Each row shows one size and condition. Follow the model link for details, then ask about the equipment available.

Compare 20 and 40 feet, new and used · GBP · Excl. VAT
SizeCatalogue conditionGuide price · Excl. VAT
20′New · one trip£13,900
20′Used · excellent condition£4,650
20′Used · good condition£3,810
20′Used · last trip£3,040
40′New · one trip£22,200
40′Used · excellent condition£8,900
40′Used · good condition£7,300
40′Used · last trip£5,830

Guide prices exclude VAT, delivery, unloading and electrical connection. The supplier’s quote confirms the unit, tests, included equipment and current delivered total.

Comparing prices by size and condition

The tables link each size and condition to its model page. Compare the same goods, temperature duty and loading pattern. Colour selections share each model’s catalogue guide price; ask separately about repainting or changes in the actual offer.

Check the container body and refrigeration unit separately

Assess floor, doors, seals and insulation separately from the cooling machinery. Identify the refrigeration model, service history, repairs and recorded tests. A condition grade or tidy shell does not establish cooling performance.

What the price should let you compare
ItemThings to ask forWhat not to assume
Container body and insulationPhotos of the container, defects, repairs, and equipmentThe colour doesn't prove good technical condition
Refrigeration unitBrand, model, maintenance and test resultsA condition report doesn't prove the unit cools properly
ServicesTransport, unloading, installation and planned workThe purchase price doesn't necessarily cover everything you need to use it
OperationConditions of use, maintenance and energy consumption for your needsSize alone doesn't tell you the energy consumption

Choose the right size before comparing price per volume

Give the goods, maximum stock, arrival and storage temperatures and door-opening pattern. Holding cold goods and cooling warm goods are different duties. Compare 20ft and 40ft loading plans with the airflow and batch access required by each unit.

Add transport and unloading

Give the actual address, entrance, route, ground and final position to every provider. Ask whether transport includes unloading and placement, and identify site equipment and preparation still needed. A distance alone does not establish the required delivery service.

Add transport and unloading. 1: Container. 2: Transport and unloading. 3: Placement and equipment.

Visual reference

  1. Container
  2. Transport and unloading
  3. Placement and equipment

Illustrative diagram, not to scale.

Plan for electricity, connection and testing

Have a qualified electrician check the actual unit’s requirements against the site supply, protection and connection. Obtain separate prices and responsibilities for connection, commissioning and testing. List any alarms or temperature recording you need rather than assuming they are included.

Estimate the electricity bill and maintenance

A power rating in kW is not energy use in kWh. Ask for measured consumption or an estimate stating set temperature, weather, load, door use and running time.

Apply your electricity-contract rates to consumption for that duty. Add maintenance, replacement items and any breakdown service, with its terms identified.

Ask for a detailed quote before buying

Have the actual unit, machinery, equipment, repairs and tests identified in an itemised offer, with VAT, delivery, timing and sale terms. If warranty or maintenance cover is offered, check its scope, exclusions and contact arrangements.

What information should you send to request a price?

Attach the temperature brief, load layout and site plan, with quantity and desired date. Ask for missing work and costs to be identified before comparing totals. An enquiry does not place an order.

Costs and equipment to clarify with the seller

  • Same goods, temperature duty and loading pattern compared.
  • Machinery, repairs and tests identified.
  • Included equipment and optional monitoring separated.
  • VAT, transport, unloading and placement priced.
  • Connection and commissioning responsibilities agreed.
  • Energy assumptions, maintenance and unpriced items recorded.

Prepare your choice and enquiry

Key points

  • Compare the refrigeration equipment as well as the body.
  • Displayed prices are indicative and exclude VAT. Add transport, unloading, electrical connection, and operating costs.
  • Include connection, tests, energy and maintenance in the budget.