Back to catalog

CONTAINER AVENUE / Project guides

Refrigerated shipping container prices

See the estimates

The price table gives catalog estimates in USD by size and condition. To compare what it costs to run a reefer at your site, add delivery, electrical work and startup. On a used unit, price tests and needed repairs before comparing it with a new one.

Compare 20 and 40 feet, new and used

Compare dimensions, doors and condition around the goods. The seller confirms the actual container and complete delivered price.

Compare 20 and 40 feet, new and used · USD · Before applicable sales tax
SizeConditionContainer estimate · Before applicable sales tax
20′New · one trip$20,100
20′Used · excellent condition$8,760
20′Used · good condition$7,190
20′Used · last trip$5,750
40′New · one trip$25,700
40′Used · excellent condition$12,600
40′Used · good condition$10,300
40′Used · last trip$8,290

Estimates in USD before applicable sales tax, delivery and unloading. The seller confirms taxes and the complete price for your delivery address.

Start with a 20ft or 40ft price for the same job

Pick the smallest configuration that handles your busiest load with the air paths and retrieval space it needs. Compare the same target temperature and loading conditions when you ask sellers to explain the price difference.

Get separate terms for the box and the machine

Ask whether the quote covers the shell, compressor, controller and any recent repairs. For a used unit, request the recorded test and get parts, labor and service-call terms in writing. A shell in good shape can still need refrigeration work.

Price capacity around the load you’ll actually store

Get a drawing of the loaded pallets and the machinery space. If you need to cool warm stock, ask for evidence for that job. Matching just the length and set point can leave you comparing two different cooling capabilities.

Itemize delivery and the location of service panels

Tell the carrier where the doors and machinery need to face. Check the space to unload and service the equipment without moving the unit. Ask for a price that includes the placement you need.

Itemize delivery and the location of service panels. 1: Container. 2: Transport and unloading. 3: Placement and equipment.

Visual reference

  1. Container
  2. Transport and unloading
  3. Placement and equipment

Illustrative diagram, not to scale.

Include electrical hookup and commissioning

Have an electrician check the quoted electrical requirements against the service at the pad. Ask who supplies the connection, who starts the machine and which test you can see before your first load goes in.

Estimate operating costs using real usage

If the seller can provide energy data under conditions close to yours, multiply daily kWh by the expected days of use and your electricity rate. Ask your utility about demand charges if they apply. Budget for cleaning, maintenance and a service call as separate items.

Compare the first year as well as the purchase price

Add purchase, delivery, startup and expected first-year operating costs. Keep assumptions such as hours, ambient temperature and door openings the same. Check what equipment or extra work each quote includes before totaling it.

Give sellers the same purchase brief

Specify the model size, load temperature and electrical service you have. Ask for the tested equipment, work included, delivery position and applicable sales tax on the same written offer.

Line items for a complete reefer estimate

  • Container, refrigeration equipment and test documentation.
  • Delivery, placement, electrical hookup and startup.
  • Electricity, maintenance and separate shell and machine terms.

Refrigerated-container budget questions

Why can a used reefer cost more to put into service than expected?

The purchase price can leave out repairs, an electrical upgrade or the tests you need before storing stock. Ask who performs each item and compare the total ready-to-run cost.

Can I calculate the electricity bill from the nameplate?

Use the nameplate to check the required electrical supply. For running cost, ask for usage data close to your conditions or measure it during a representative period. Outdoor temperature, load and door openings affect consumption.

Technical references

Prepare your choice and inquiry

Key points

  • Compare ready-to-run quotes at the same product temperature.
  • Break out startup, power and service costs explicitly.
  • The reefer estimates are in USD before applicable sales tax. Confirm which parts the seller covers.