A shipping container can fit perfectly on its pad while the delivery truck has nowhere to unload it. Walk the entire route from the street to the drop spot and agree on the unloading method before setting the date.

Find out what your delivery quote includes

Ask whether the quote covers hauling only, unloading to the ground, or placing the container in the spot you marked. If you need a crane or other unloading equipment, identify who supplies it and who coordinates with the driver.

From the truck to your site

Plan access and placement together. These three views help you describe your site to the supplier.

Crane unloadingSide view: a truck-mounted crane with stabilizers, lifting a container from its four upper corners above the placement area.

Crane unloading

A truck-mounted crane can place the container from a suitable working area. The supplier confirms the vehicle, lifting reach and space needed for its stabilizers.

Access & maneuveringTop view: a gate, truck, approach route and container position, with clear maneuvering space.

Access & maneuvering

Provide gate width, bends, slopes and obstacles. The access route must suit the selected truck, all the way to its unloading area.

Ground & door clearanceTop view: a container at its final position, with two open doors and swing arcs. A spirit level represents ground preparation.

Ground & door clearance

Prepare a stable, level position. Leave space in front of the doors for their swing and for handling goods; the supplier confirms suitable supports.

4 details to share

  • Gate and maneuvering space
  • Ground type and stability
  • Overhead cables, branches and obstacles
  • Final position and door clearance

Illustrative diagrams, not to scale. The supplier confirms vehicle dimensions, distances and unloading method for your site.

Walk the approach from the street

Measure the narrowest gate and photograph the sharpest turn from the direction the truck will arrive. Add slopes, soft shoulders, overhead lines and low branches. Tell the carrier if it has to back in from a busy road.

Allow room for a tilt-bed to pull forward

As the bed tilts and the box slides off, the truck needs room to move forward and the raised bed needs overhead clearance. A 40ft typically calls for more working length. Have the carrier confirm both measurements for its equipment.

Send a photo with the drop spot and door end marked

Mark where the unit should sit and draw an arrow showing which way the doors face. Include the truck’s approach on the same image. If the property has more than one gate, include the street-facing view of the correct one.

Confirm charges before the truck leaves the yard

Ask what happens if rain closes the access road, there’s a wait at the gate, or the driver finds an obstruction. If part of the unload would be on a public street, ask the relevant local office who can authorize the work.

Keep the truck route clear on delivery day

Have one person on site who can point out the approach and make placement decisions. Move parked vehicles and let the driver direct the unloading. Keep people away from the working area.

Inspect the unit once it is safely in place

Match the container number to the offer, look for new damage, and open and close the doors. Photograph any issue and follow the reporting process agreed with the seller.

What the dispatcher needs

  • Street address, ZIP code and correct gate.
  • Measured approach, overhead clearance and any soft ground.
  • Door orientation, unloading method and on-site contact.

Find the right type of container

Practical questions

How much straight space does a tilt-bed need?

Ask the carrier for the straight run it needs for the chosen container and truck. Measure from the drop spot along the unloading path. Include the space the truck needs after the box is on the ground.

Can the driver drop a container on grass?

Show the carrier the surface and its condition on the expected delivery day. A loaded truck can sink or rut soft ground. Ask what surface it will accept or whether another unloading method is workable.

Technical references

Key points

  • Quote hauling, unloading and final placement explicitly.
  • Measure the working route and overhead space in addition to the pad.